Our website uses cookies to improve your experience. Click here to see our Cookie Policy.

X

News archive

November 2018 September 2018 July 2018 May 2018 March 2018

Product bulletin archive

12 December 2018 14 November 2018 17 October 2018 19 September 2018 23 August 2018
hdm magazine digital edition - November 2018

Media information

hdm media pack download total audience coverage

mental health and dementia facilities magazine (mhdf)

mental health and dementia facilities magazine (mhdf)

Total Audience Coverage

Total Audience Coverage

Our T.A.C packages offer maximum coverage with
on-the-page advertising,
stand-alone e-mail broadcasts, monthly bulletins and web site promotions.

SEE ALSO

healthcare buildings forum

healthcare buildings forum

 

mental health & dementia facilities forum

mental health & dementia
facilities forum

News archive - January 2017

BIM - taking the NHS into the 21st Century

BIM - taking the NHS into the 21st Century

Simply put, BIM is an NHS estate manager’s dream.

The holistic answer to the construction industry’s unrelenting question of how to build everything and anything more safely and faster, BIM achieves higher quality standards more cheaply and, when coupled with offsite construction, creates even-greater efficiencies.

BIM relies heavily on better planning and design, so a building can perform to the highest standard throughout its lifecycle, from concept to demolition.

In one single model, BIM pulls everything together stakeholders’ opinions, optimising environmental performance, supply chain management, and identifying clashes early in the construction process.

What’s more, the Government is leading the way - a main contractor builder tendering for a public-sector building, such as a hospital, must have BIM Level 2 fully engrained into its business.

Beyond bricks and mortar

The NHS has a responsibility to account for its assets, and the launch of BIM4Health, in November 2014, was a key step towards greater transparency.

BIM4Health’s focus is on BIM Level 2 and getting the supply chain to shift from a culture of independence towards one of collaboration - which is what BIM is all about.

Combining the expertise of every party through one 3D, integrated, digital model to optimise a building’s performance, BIM results in a greater whole-life cost value of the asset, from a building’s primary use to how that may change over time. The upfront cost is clear and the savings to be made in the future are transparent.

3D visualisation of what a new build will look like, its environmental performance and savings made throughout a building’s life, enables estates managers to see beyond bricks and mortar and the possibility of modular methods.

Time is of the essence in the healthcare sector and we will see a shift from traditional building methods to the quick design and delivery using offsite construction.

For example, a small outpatient or specialist treatment facility can be operational after just one month’s onsite works, whereas a traditional build programme generally takes upwards of 26 weeks.

BIM brings real opportunity to personalise buildings to meet not just sustainability and environmental targets. but also the needs of today and the future.

A high-quality solution

Offsite or modular construction methods have often been seen as expensive compared to traditional build - but BIM is a game-changer.

Modular buildings can now be built to any specification - BREEAM, PassivHaus or AECB. As BIM helps to extend design life, it can exploit advances in materials and improvements in sustainability and energy efficiency.

Although initial costs are broadly similar, the speed of build and reduced time onsite delivers tangible benefits for modular-over-traditional build. The whole-life cost and efficiencies weigh in favour of offsite.

Buildings manufactured in factories and assembled onsite make the construction industry safer due to their more-controlled environments. They are also faster - just four weeks in some cases - making it easier for estates and facilities managers to plan and redirect resources.

The capabilities of offsite more than match traditional build.

Patient wards, theatres, A&E departments, and cleanrooms can all be designed, built, and delivered in 12 weeks, reducing the impact on bed availability and the need for interim short-term hire.

We were one of the first offsite construction companies to meet BIM Level 2 and it has been fully integrated into the business since July 2015.

Instrumental in winning new business, this means we can now showcase the true benefits of offsite build as a quick, cost-effective, and high-quality solution.

 « 