Pipework sizing is crucial to the control of Legionella in water systems
Pipework sizing is crucial to the control of Legionella in water systems
Water safety – pipework sizing and Legionella

Roy Sullivan, senior consultant and authorising engineer [Water] at the Water Hygiene Centre, takes a look at pipework sizing and why it matters when controlling Legionella

When carrying out a project that involves installing domestic hot and cold-water systems, be it a refurbishment or a new build, the hot and cold pipework must be sized correctly for the system to function as designed.

In small simple installations, it is often accepted that pipes are sized based on previous experience and ‘common practice’ methodology. For all other larger installations, the peak design flow rates should be calculated using a recognised method, such as in BS8558-2015 or BS EN 803 – 3.

Water demand and impacts of incorrectly-sized pipework

Peak demand is often overestimated at the design stage, which can bring problems, such as cost inefficiency and water quality problems.

Incorrectly-sized pipework can also produce unwanted noise within a system due to velocity being incorrect.

FIGURE 1
FIGURE 1

Correctly sizing pipework also avoids scouring and undue wear of the pipework.

Non-residential buildings have significant water demand that is nearly always driven by the behaviour of their intended occupants.

And this means that water use during daytime hours is a specific feature that differentiates the profile from that of residential buildings.

In the UK, however, the Loading Unit (LU) approach is currently used to estimate design flow rates for both residential and non-residential buildings.

Annex C of BS8558-2015 gives further guidance in this area.

Source, flow, and frequency of your water

The source or intended supply also needs to be considered; is it mains fed? Boosted? Gravity fed?

If boosted, is the booster set sized according to the intended design, and conversely is the pipework sized to consider expected booster pressure?

In most buildings, whether domestic or non-domestic, it is unlikely that all the assets or appliances within the building will be used simultaneously.

So, for reasons of economy a simultaneous demand, which is less than the maximum demand from all appliances, should be provided for.

FIGURE 2
FIGURE 2
Roy Sullivan
Roy Sullivan

Usage and habits have changed in recent years, and drinking water demand has been down in previous years as drinking water is available from other sources, i.e. bottled water.

Occupants are also more aware and mindful of waste.

This demand can be calculated by relating to similarly-designed installations or by using the application of probability theory using loading units.

Loading units are factors that consider the flow rate of the asset, the length of time in use, and the frequency of use.

When making these calculations you need to take into account the number of each type of asset/appliance, and the length of the feed pipe being considered, which is then multiplied by the loading unit as shown in FIGURE 1 which is an extract from BS8558-2015;

It is not applicable where usage is intensive. In such cases it is necessary to establish the pattern of usage and appropriate peak flow demand for each case on its own merits.

Other considerations

The flow rate or velocity can also be affected by the various pipework fittings used within the system as well as elbows, tees, connectors, check valves, flow restrictors, and the type of tap being used. 

FIGURE 2 is an extract from BS8558-2015 and shows examples where the loss of flow may occur as a result:

Hot water return pipes must fulfil other hydraulic requirements and cannot be sized using this method.

These pipes need to be sized to achieve the velocity required by national or manufacturer recommendations.

For assets that are fed by both hot and cold supplies, the loading model assumes that equal demand is met. However, this is certainly not when it comes to thermostatically-controlled mixing taps, for example, and this must be considered by not combining the hot and cold supply calculations and a separate calculation is used for each.

Conclusion

As with all water safety projects, getting it right first time will save time, money, and resources.

It is important when calculating pipework sizes that the principal designer considers:

  • Intended usage of the system; will there be excessive use at certain times?
  • Probable, peak, and simultaneous demand
  • The implications of connecting to an existing system. How will this affect performance?
  • Assets or appliances fed by both hot and cold water; separate hot and cold loading calculations are needed
Related Stories
Vital Energi builds a sustainable future for Coventry hospitals
Vital Energi is delivering financial savings of £1.6m a year for University Hospitals Coventry and Warwickshire NHS Trust (UHCW), money that will be used to improve patient care. As part of a project delivered under the Carbon and Energy Fund (CEF), the company has also helped reduce the carbon footprint of UHCW’s two hospital sites by 4,125 tonnes a year after installing futureproof energy generation equipment. It involved significant restructuring works of University Hospital Coventry’s main clinical w...
NHS tells suppliers to cut their carbon footprint
Supply chain support 'vital' to achieving net-zero carbon goal
Tropical species a ‘serious risk’ in hospital buildings
Hospital estates and facilities managers are being warned to take action against a ‘tiny pest’ which could have serious implications for health services. Pharoah ants are tiny, but can create huge colonies that will split if threatened and can potentially spiral out of control, says the British Pest Control Association (BPCA). And, in the UK, the pests will only be found in the structures of large centrally-heated buildings – with hospitals providing an ideal habitat. But specialist products can effectiv...
Five key considerations for hospital relocations
When we worked with Heartlands Hospital in Birmingham, we relocated X-ray files which were stored in a basement only accessible via a spiral staircase. We also had to make sure all records stayed in chronological order. Double down on security Part of a successful healthcare move relies heavily on how effective the administration side of the hospital is delivered. This includes paper and digital records which must be kept secure, confidential, and intact. For paper records, we take an extensive audit an...
Securing funding to reach net-zero targets
Siemens Financial Services report reveals $2.2bn 'investment gap' in energy efficiency financing across European healthcare buildings

Login / Sign up